Answer Posted / bhavya
service quality plan
A plan that underlies the Service Strategy, detailing the internal targets to be achieved within an agreed period, typically one to two...
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Which are the top apps for you civil engineer?
Which purpose we use deck anchor in bridges?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
Why the statue of liberty is made of copper?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
rimmer in pile foundation
What is GSB gradation
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
The mixture of different ingredients of cement is burnt at?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
How to arrive dry volume of concrete (1.52 to 1.57) ?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)