how to calculate 1:1.5:3 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / deepak
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg
For 1m3 of M20 (1:1.5:3)
Broken stone = 0.856 m3
Sand = 0.472 m3
Cement = 8.22 bag
| Is This Answer Correct ? | 132 Yes | 13 No |
Post New Answer View All Answers
How to calculate chejja reinforcement
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
Define What is made from large rocks, which protects the base of cliffs?
What are the problems one might face while having a Cantilever balcony?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
How do you calculate load bearing capacity of a waffle slab?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
to draw bm diagrams for portal frames under different loadings//
What in bending moment, if a moment is free end of cantilever beam?
Explain the different types of roofing systems?
define the strength
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard