how to calculate 1:1.5:3 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / deepak
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg
For 1m3 of M20 (1:1.5:3)
Broken stone = 0.856 m3
Sand = 0.472 m3
Cement = 8.22 bag
| Is This Answer Correct ? | 132 Yes | 13 No |
Post New Answer View All Answers
How much does the leaning tower of pisa lean?
Any strength is a stress but any stress is not strength
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
how much area can be platered by a mason for exterior
What is zoning permit?
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
How will be cutting in timber plate size 600*400 column size
Define What glue is least sticky?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
What does civil status mean?
how much of the strength comes from post-production curing
How to calculate Volume of Wet cement concrete for a specific grade?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.