concrete cube strength if fail 1 no in 7 days .What is the
solution
Answer Posted / riaz
The actual result come after 28 days but it still depend on weather condition
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How can we convert weight batch to volume batch for m30 mix
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
What is min thickness,min grade of conc & age of PQC ?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
what is the difference b/w full length and cutting length?
I need to constructive work in amaraj batteries
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
what is the water-cement ratio of mix design while 30mpa in 7 days?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering