Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How do you calculate the surface area of the paver blocks,
in oreder to find out the compressive strength of the
same ?? And which codes are used for testing of paver
blocks ?

Answer Posted / riaz

The calculation shall be done on contact surface only where the load is applied

Is This Answer Correct ?    16 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the criteria for the finalisation of pavement thickness in road project?

2125


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

1990


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

2314


what is the difference between natural draught cooling tower and induced draught cooling tower

2273


how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......

1861


can you provide a link for manual design of building?

1549


what is the function of GSB all class ?

1224


What is pre-stressed concrete?

1113


how to calculate rate analysys of 1:6 plastering 10 sq m

2940


What is alternate bid?

1143


what does the grad of cement shows (denotes)?

1597


Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?

2628


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3765


what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????

1931


Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

2085