i have 1000 records in my dource table, the same i have in
target ,but a new column added in target as "batchno", and
this column adds no 10 for 1st 100 records and 20 for next
100 records and 30 next 100 records and vice versa. how to
acheive this?
Answer Posted / srikanth
target update over ride..
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is the difference between informatica6.1 and infomatica7.1
What is the difference between power center and power mart? What is the procedure for creating independent data marts from informatica 7.1?
I have worked on Informatica 7.1.1. I want to know the answer for the below question. Target is not created initially.Then how to take the DDL script from the source and run the Mapping by creating the Target dynamically?Is it possible by SQL Transformation?
Suppose we do not group by on any ports of the aggregator what will be the output?
What is the difference between source qualifier transformations source filter to filter transformation?
How to create different types of slowly changing dimensions (SCD) in informatica using the mapping wizard?
what is granularity,what type of granularity we will take in fact tables either lowlevel or highlevel,if two tables having same granularity that is posiable or not
Tell me about MD5 functions in informatica
I want my deployment group to refer an external configuration file, while i deploy in the production environment. How can i achieve it.
What is rank transformation?
To import the flat file definition into the designer where should the flat file be placed?
Can we use the mapping parameter or variables developed in one mapping into any other reusable transformation?
What is data movement mode in Informatica and difference between them?
What are the measure objects?
Is it possible to use a client with different version than that of its Informatica server?