How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / farvaris kumar
brick = 480 (as pr calculation)
.3= dry volume of brick mortar
cement = .3*28.8/total of ratio(6)
= 1.44 begs in one cum
sand = .3*quantity of sand(5)/total of ratio
= .255 for one cum
| Is This Answer Correct ? | 58 Yes | 27 No |
Post New Answer View All Answers
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
what is flexible and rigid footing?
what are the challenges of being a team leader and a supervisor?
How can we convert weight batch to volume batch for m30 mix
how to find out hard strata in bored pile when the DMC method adopted.
What is difference between limit state and working stress method? How it is applies in building structure.
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
what is m30 in concrete tiles
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
What are the materials used in building a gravity dam?
What are the applications of modulus of elasticity?
What is the Null Point of chimney in Power Plant
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.