what are the compressive strength requirements(in 7 days &
28 days) of cement sand mix used for plastering purpose
(Cement:sand-1:6)? Kindly give the IS Code reference also.
Answer Posted / sagar
67%
Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
psc girder detail
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
How do we calculate absolute pressure?
What is the significance of cost estimate knowledge for an architect?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
how pumping of concrete effects the quantity of material used in it?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
The foundations are placed below ground level, to increase?
What is absolute coordinates?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
Mention what are the composition of a landfill?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
what is Brest Wall?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?