why the horizontal crack occoured in the joint between
brick work and lintel?pls. give clarification???
Answer Posted / vikas sahu
due to not monolithic material,different density and
property of concrete in tempreture it extend.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
what is SDLC ?and write a 'c'program for to swapping the three numbers?
Is there the dry coefficient of cement is constant?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
what is the breaking strength of wall tiles
what is stressing
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
Why should pumping be not used in case of concreting work?
What will you do if you encounter problems like accidents?
Discuss some applications of modular elasticity?
Which ratio use for cement selery???
What is unit weight of normal concrete?
I need old MMUP exam question and answer for Civil engineering
How to design staircase.plz tell me formula for the design the staircase.
why the profile of shell of natural draught cooling tower is hyperabolic.