What are the types of Road in India?

Answer Posted / dhir

A]EARTH ROADS
Ordinary earth road
Stabilized earth road
B]GRAVEL ROADS
C]WATER BOUND MACADAM ROADS
D]BITUMINOUS ROADS
1.Surface painting road or surface dressing road
2.Bituminous macadam road
3.Bituminous concrete road
4.Sheet asphalt road or asphaltic mat
E]CEMENT CONCRETE ROADS

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?

1901


How much quantity water should be placed in one cubic meter area?

907


Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

1485


Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?

1520


What is the use of extruded feature in solidsworks?

784






to minimize budget cost of building , what can i do

1678


01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.

5073


how many shuttering material required for 1000 sq.m built up area.

1892


Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

1697


Why the finite element method is lower bound solution?

2332


How much cement is require in one sqft area in a G+3 residential construction.

1625


Did any of the egyptian pyramids ever fall down?

747


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2052


What are the different softwares used for cad?

739


what is the use of beam end forces while using a staad ? wha they are show

2484