Pricing Procedure – How Pricing procedure taking place in
the PO
Answer Posted / upamanyu sarmah
Pricing is determined by the calculation schema.
The calculation schema itself is determined based on the schema group with which it is assigned. Schema groups are either based on the POrg or Vendors. So based on POrg/Vendor the PO will pick up the relevant Calculation Schema and do the pricing.
The calculation schema contains condition types in an order. These condition types, like Gross Price, Surcharge etc, are stored in tables called Condition Tables and the value for these condition types are retrieved using Access Sequence.
This is an overview, and further information can be found in :
http://help.sap.com/saphelp_470/helpdata/en/75/ee12f955c811d189900000e8322d00/content.htm
Regards,
Upamanyu
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What is 'goods movement'?
What is sap? How is it used in industries?
difference between mto
How do we create consignment stocks?
Explain release strategy
What is the procedure to give specifications for developments?
What mrp (material requirement planning) list is and what is the transaction code to access mrp list?
Explain rtp
What are the data in material master that are maintained at the company code level?
Explain how consignment stocks are created?
What is the source of error "not allowed" in case of custom movement type creation?
What settings required to create purchase order automatically from a pr?
Define client. What is its importance in sap?
Where is material master data saved?
Explain the mm flow with tcodes & tables?