Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Please tell me 1 ton = How many Kilowatt (Electrical)

Answer Posted / b.sudhahar bagavathiappan

I have think 1 ton = 1.2 kw, HVAC design pepoles are using
that value for constrction works

Is This Answer Correct ?    54 Yes 16 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is meant by k-rating in isolation transformer?what is k9, k14 stands for?

2742


Sir 33kva 2 transformer load 900 amp calc 1800 amp mana jayega

1794


what is the clear formula to calculate cable size for a load

1945


What are the advantages and disadvantages of open loop control system?

1076


Load transfer in 11kv double busbar switchgear - operation.

1925


PLEASE SEND ME NTPC RELATED INFORMATION LIKE WHICH TOPICS HAV MORE SCOPE,BOOKS TO READ,CUT OFF...PLEASE.mail at thiru.1203@gmail.com

2071


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

1762


What is measurement?

1153


11 kV line deraction check by an Engineer.

1941


How to Prepare preventive maintenance shedule of machine tool.

1984


How line capacitance & line inductance varies with increase in height tower.

2309


(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1823


Define step response?

1121


Mention the disadvantages of low power factor? How can it be improved?

1110


If we use 250A MCCB as a incomer in Control panel for a fault level of 50kA for one second ,assuming temperature rise from 85 Deg. to 100 Deg , Then what will be the Aluminium Bus-bar size for 250A MCCB? Explain in detail.

2310