How many input links can you give to a Transformer stage?
Answer Posted / sai
In Parallel jobs,Transformer can have one input
link ,multiple output links and single reject link.
But in Server jobs,Transformer can have one input
link ,multiple reference links,multiple output links and
single reject link.
| Is This Answer Correct ? | 13 Yes | 2 No |
Post New Answer View All Answers
what are the errors,warnings in datastage
How to create a file using vi editor? 2)how to delete a file in vi editor? 3)How to connect the server datastage to unix? what r the command lines we r using? 4)30 jobs r runnig in unix i want to find out my job. how to do this? give me command?
Define project in datastage?
how to read 100 records at a time in source a) hw is it fr metadata Same and b) if metadata is nt same?
Explain usage analysis in datastage?
client know skid info?
What is apt_config in datastage?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
1)How will u implement SCD2 by using surrogate key. 2)What are the disadvantages with surrogate key. 3)How will you handle nulls in your project for the varchar, integer data types. 4)Can I use two fact tables in star schema. 5)3 jobs are running on the 2 nodes after I added one more node so can I compile those jobs to run on three nodes.
What are the differences between datastage and informatica?
Name the third party tools that can be used in datastage?
Why do we use link partitioner and link collector in datastage?
How do you start developing a datastage project?
What is quality stage?
What are the features of datastage flow designer?