Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the difference between first angle projection and
third angle projection?

Answer Posted / naveen

First angle projection
1. The object is kept in the first quadrant.
2. The object lies between the observer and the plane of projection.
3. In this method, when the views are drawn in their relative positions, planed comes below the elevation.


Third angle projection
1. The object is assumed to be kept in the third quadrant.
2. The plane of projection lies between the observer and the object.
3. In this method, when the vies are drawn in their relative positions, the plan , comes above the elevation.

Is This Answer Correct ?    12 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the uses of groynes?

1068


how to calculate the size of triangular ring in rcc column?

1758


Slab quantity 

1973


Detection of a beam & a girder are––––

2166


Explain the mechanism of cavitations in pipes and drains?

1060


what is right & short method of measurement of slab&beam

2015


List out some of the software program that can be useful for architect?

1069


Which brick is best for construction ,either fly ash or AAC BLOCKS

962


how many time use of plywood shuttering and IS code

3192


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2097


To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?

1902


If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

1955


How can i do RCC rate analysis?

1638


What is meant by engineering drawing?

1014


how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress

1799