calculation of quantities of cement and sand in 1cum mortar
with 1:6 ratio
Answer Posted / soumen jana
cement ;- 4 begs & 5.75 kg
sand ;- 30.25 cft
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
What is Critical path in Ms-Project ?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
what is civil all interview questions
Which tests are performed on soil to decide the type of foundation to be provided.
why are you joining in this (applied post) job and your aim for this job
How to do base isolation for RC framed structure using ETABS software?
Explain what is Hybrid Foundation?
significance of specific surface area of particles?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
questions with answers to face an interview of an civil engineer regarding RCC buidings
RR masonry rate analysis
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
How can i display 5 asterisk and another 5 asterisk )?