What should be percentage of silt content in sand?
Answer Posted / sandip kakde
less than 7 %
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
How much cement,sand,bricks and water needed for 1square metre brick work?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
how to find out hard strata in bored pile when the DMC method adopted.
how many tonnes equals to one cubic feet?
WHAT IS YOUR CURRENT SALARY
Describe the sections included in a typical bill of quantities
Please design 12.5m long dubbly beam
what is the formula to find the diagonal shape stirrups?
what is castigliano theaorem
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
What is command line?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC