ratio of rcc 1:1.5:3 grade of concrete ,7days& 14&28 days
after curing how much strength of compressive strength in
rcc slab
Answer Posted / ceenu.143
techanical
| Is This Answer Correct ? | 1 Yes | 10 No |
Post New Answer View All Answers
How many mortar required for Brickwork of 1 Cu.m works??
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
Who name us Engineer & Why?
What do you mean by bond? What are the different types of bonds?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
how much shouid be the rate for ready mix concrete per cubic meter
Time required for curing of wall tiles before fixing
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
What is the coeffiencent Friction Angle between Steel and Ashphalt?
Define polar co ordinates.
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
Define different types of roof systems?
Which are the Steel tests ?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?