Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate density(dry & bulk) of sand from Sp.
ravity value of sand. eg. G=2.5

Answer Posted / silambarasan

PERCENTAGE OF SAND/SPECIFIC GRAVITY MULTIPLIED BY 100 U WILL
GET A DENSITY.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much area can be platered by a mason for exterior

1960


Explain what are the skills required to become an architect?

1174


How long does it take concrete to harden?

1179


What is gravity flow?

1205


How did the romans get water up hills using aqua ducts?

1296


i want texture painting pwd data

2087


What are the materials used in building a gravity dam?

1116


What is the meaning of a blue land surveyors flag?

1456


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2277


List out some of the software program that can be useful for architect?

1122


Can a wave happen in the middle of the ocean like in the movie poseidon 2006?

1281


Sir how to find cutting length for footing steel bars in the shape of "u"

1779


SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?

2727


what is the 0 value in quantity surveying

2409


What is the method of soil replacement test?

2149