I have created a customer with Account group XXXX and also
done some transactions till billing, now I want to change the
account group from XXXX to YYYY. How can I change and what
about the transactions already happened?
Answer Posted / kumar
Its not possible to change the Account group once created.
If this is the case create the new customer with the
required account group and set the deletion flag for the old
customer.
| Is This Answer Correct ? | 0 Yes | 21 No |
Post New Answer View All Answers
What is product attributes?
Explain the relationship between sales organizations and plants.
List out the five features you can control for the sale document type?
Understanding Clint business process & Relevant Sap Logic Review of Business & Technical Documention
What is the transaction code for creating a material in sap and what is the transaction code to extend a material?
Define the material taxes in ovk4, which will then be maintain in material master.
how we will configure export sales in sd (respect to plants assign and sales process)?
How to maintain number ranges for sales document types?
What are the various sections of the 'customer master record'?
List the basic elements of a customer master record?
Name at least five features that you can control for the schedule line category? Relevance for delivery, availability check, transfer of requirements, goods movement, purchasing and incompletion log.
sd validation of advance payment. eg sales order(1234) raised on 14 jan 2012. validity of sales order is 30 jan 2012 advance paym should receive before 25 jan 2012 any payment against this order should not be received after 26 jan 2012
How many pricing procedures you have configured in the system and what are their purposes?
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling
What kind of reporting and analytics capabilities does sap transportation management have? : transportation management