concrete cube strength if fail 1 no in 7 days .What is the
solution
Answer Posted / shashank
wait till 28 days result will come some time 7 days result
will fail due to poor workmanship will pouring the cube
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What will you do if you encounter problems like accidents?
how do we design mix ratio?
Howmuch bend to be provide for 200/600 BEEM
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
very simple or less time consuming formula for reinforcement calculation by moment
What is the difference between built area and super built up area?
What are the basic use of runners and standards of pipelines?
what is education Cess.
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
What will you do if a portion of load bearing wall collapses under your supervision?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
Formula for calculating the volume of bulb in underreamed pile
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?