What is the role of a PMC(project management consultancy)
in any construction work?
Answer Posted / uttam
PMC's primary role is to lead, guide, coordinate and
synchronize the professional inputs from various specialist consultants. It is also includes monitoring, controlling, solving problems, conflicts management and making decisions. His role is multi-disciplinary and his responsibility is to
synthesize and integrate all the aspects of a project into a cohesive whole. The PM role is to lead, guide, steer, inspire, and motivate his entire project team and to marshal all necessary resources to implement and manage tasks and
activities in order to achieve milestones and project deliverables, usually in terms of time cost and quality in order to ensure project success, avoid or reduce project
failure altogether.
| Is This Answer Correct ? | 39 Yes | 3 No |
Post New Answer View All Answers
What is meant by autocad?
why we create short columns under grade slab?
What is demising walls?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
What is absolute pressure? How absolute pressure is calculated?
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
what is BPM in concrete demolition hammers. what is better a higher value or lower
what is the composition of good brick ?
how clculate excavated or backfilling quantity by simpson's rule
How do you calculate the power of centrifugal pump?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
how to determine H- zone in a column? where it will occur?