what is the difference between stress and pressure??
Answer Posted / senthil kumar.s
stress=resistive force/area pressure=force/
area
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
What is the meaning of a blue land surveyors flag?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
how to absorb to site basic corrections? which are the important correction?
What is the Null Point of chimney in Power Plant
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
Are cruise ships built for the transatlantic run?
Material calculation of cm 1:6 for 1sqm
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
How much is the cover for slab?
How many cement sand ballast in cc 1:4:8 40mm
What ingredients with% found in ppc cement??
What is quantity of cement and sand required for 2000sqft of tiling?
What is rate for brick masonry work of 1.0 m3 in cm 1:6?