Answer Posted / anil
M stand for Metric M24 Metric24
| Is This Answer Correct ? | 20 Yes | 0 No |
Post New Answer View All Answers
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What is the tallest man made structure in the world?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
What difference comes in constructing of house and a housing complex like society
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
Does VDF add strength to the flooring apart from preventing water ingress?
Which is the direction for positive angle?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
How cracks in concrete can be avoided?
why does the most of civil engg is not intersted to going for teaching field?
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
Explain the various stages of the project planning process in construction?