Answer Posted / rupesh
surveying,planing,drawing,designing ,execution,creativity.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What is oneside mat. And explainÂ
Explain what is the difference between built area and super built up area?
Why should pumping be not used in case of concreting works?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
how to estimate material requirement for an area of house in square feet?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
What is the development length given in pile?
What Reinforcements Are Used In The Process Of Prestressing?
what is difference between GTS bench mark and temporary bench mark
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
Why are pull-out tests performed for soil nails?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction