how many bricks,cement,sand of a 40*30*6 ft bowndry wall?
Answer Posted / partha mitra
Mr. syed you dont know any thing.this is absolutely wrong
answer.number of brick should be 9700nos.(brick size-
250mm*125mm*75mm)
Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
Please design 12.5m long dubbly beam
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
what"s the sort of beams?
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
What are the responsibilities of a site manager?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
What are the alternate material for steel, Sand and aggregate
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance