Answer Posted / amit
My senior while
checkin ht
motor ,first he
measured
resistance using
micro ohmmeter
and he got 25m
ohms after tat he
meggered it
getting 5Gohms...
So i asked this
question...
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is the need to express current and voltage in rms value? rms value is also called as effective value,what is effective value?
How much dc volt applied in cathodic protection system?
how to calculate the fault in substation
How the setting of the vector surge relay shall be calculated when the relay is to be used for Grid islanding application?
Write a note on Treatment for electric shock.
In 90 kva alternator that produce the output voltage is 115(p-n),200(p-p) at 1500 rpms means what ampere it produced ?
Help need in transformer !? Hello Friends The parameters of 2300/230 v 50hz t/f is R1=0.286 ohm R`2=0.319 ohm Rc=240 ohm X1=0.73 ohm X`2=0.73 ohm Xm=49.2 ohm Secondary Load impedance ZL=0.387+J0.29 solve the exact equivalent circuit with normal voltage across primery.. I know every thing but i cant find CURRENT I1=? and I`2=? Please help me give solution or only Formula please please...
defult setting in p220 micom motor proction relay for 11kv,640kw,f.l.a.-40a,1440rpm ht motor?
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
main difference between ac and dc?
how invertor convert the dc into ac give brif detail
700KW 6.6KV slip ring induction motor to use VFD to control the speed
where reactive power is used
What is resolver and glass scale in CNC how they work?
Explain how you intend to work under pressure to meet up with deadline target?