How to find the volume of wood(tree) from its height and
circumference.(circumference-6'5" and height 3'2")??
Answer Posted / abdul rasheeth
if the wood is circular in shape then the circumference of circle is=pi*d
(circumference)6'5"=3.141*d
6'5"/3'141=d
d=2.042ft
volume=area*height
=(3.141/4*2.042^2)*3'2" (height)
therefore the wood's volume=10.365 feet^3
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Slump Values for works?
how much of the strength comes from post-production curing
How to fix toll charge for a particular vehicle at toll booths in a highway?
what is the ingredient value of 40mm and 20mm aggregates?
what is difference between GTS bench mark and temporary bench mark
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
how u design STAGING for Superstructure in BRIDGE construction?
what is diversion?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
What is thumb rule in quality and quantity estimation of a Residential building??
what is the most suitable foundation when construct a bird watching tower in a marshy land
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What do you understand by “preset” during the installation process of bridge bearings?