Answer Posted / vidyasagar daley
EG:If you take 12mm thickness then caclulation to be done.
for 1cum 1:3 cement mortor then
we have to consider dry density and wet density.
wet density 50% to be taken more then actual quantity so
1x1.5=1.5cum,
1.5/1+3=0.375
1CUM CEMENT WIEGHT IS1440KG/CUM,
(0.375X1440)/50KGS(one cement bag wieght)=540kgs/cum.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
What do you mean by honeycomb in concrete?
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
For a washout valve why are two gate valves required in normal practice?
Define line type?
what values & beliefs have guided you in your career path
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
what is the coefficient for running feet to cft coversion both area and price
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
what is the criteria for the finalisation of pavement thickness in road project?
How much cement,sand,bricks and water needed for 1square metre brick work?