Answer Posted / snigda
With in 2.5 hrs, the mix should use otherwise the water
content which is added in composition will absorb by mortar
and mix will become tight.
Then, we have to add the water, where water content for that
mix will increase. Because of the same, Silt content will
increase where cracks develop on the structure (for finishes)
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
door and window wood work calculations and different methods
how to tie 10 legged stirrups
Define What does civil status mean?
What is the strongest bridge for a school contest?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
What is oneside mat. And explain
What are the uses of alloys in daily life and how are alloys made?
sir how can we find the cement and sand required for making 4" drop
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What are the uses of groynes?
what is smart building materials?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?