Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the gas pressure at normal & operating conditions of
sf6 cb??

Answer Posted / lohit

normal gas pressure
6 kg/cm2 at ambient
temp 20c° operating
pressure 5.2 kg/cm2

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is sustainable current of any conductors . a bare busbar or pvc cable has different sustainable current .

1771


what is the working process of over & under voltage relay.

2218


What is the method to solve circuit using source transformation?

1138


why different series of vfds (like allenbradley)are used in industry ?

2290


what is meant by residual over voltage & residual earth fault ?

8911


What is the difference between type1 and type2 relay protection co-ordination for motor feeders

2220


WHAT IS SITTING AMPS IN OVER-LOAD RELAY FOR 1PH OR 3PH MOTORS?IF ITS NAME PLATE GIVEN MAX AMPS 10AMPS?

1748


In constant power region of 3-phase IM torque-speed characteristics, if frequency increases slip A does not alter B decreases C increases D none of above

2050


why T/F winding temp measurement cts are odd secondary current ie,109A/1.2A/1.4A?

1862


(In MEP services) HVAC in AC Plant room what else can we provide if the chiller is not considered?

2037


why chock were used in old tubelights but are not newest tubelights?

1949


I NEED RRB APTITUDE QUESTIONS AND MODEL PAPER,PLEASE SEND MY E-MAIL joo28_eee@yahoo.co.in

1904


How maesure earth neutral value & how much maximum value value required in between earth & neutral.

2065


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2630


Which device of PlC does share load between DG sets when DG are running in perallel?

2061