Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

plz drive the formula d2/162.162 for the calculation of weight of steel bars????

Answer Posted / maninderdeep singh

We know the formula D2/162 which is being used for
calculate unit weight of reinforcement per meter.
Here I am willing to explain how it has been arrived D2/162
(Note: D unit is in MM)
Weight of bar per meter = Area of steel bar X Density of
steel x Length of bar
= (3.14 x D2/4) x 7850 kg/m3 x 1 m
= D2 X 6162.25/(1000x1000)
= D2 X (0.006162)
= D2 X 1/(0.006162)-1
= (D2/162.28)

The actual value is D2/162.28

Kindly note that this function is only applicable for
circular shape steel which density is 7850kg/m3

Is This Answer Correct ?    69 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the method used for marking of cantilevers in hirise buildings by using theodolite

2943


which method is used in semi-rigid connection design??

2280


What is difference between code and standard and specification?

2383


what is the use of water bar in water tank and is this an extra item in estimate?

2582


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2422


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3452


hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard

2102


Tell me about triple point of water.

1119


Permissible wastage of cement as per IS code ? In which IS code I get it?

1777


Why steel rods are produced only in even dimensions?

2643


how to stop beam concrete between column

2389


WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT

2622


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

13404


Explain what is Critical Path Method (C.P.M)?

1166


how do you calaculate the total steel quantity of an rcc building using thumb rule?

3704