How much steel and concrit required in 1000 square feet
slab?
Answer Posted / shivaji yadav
Steel = .12*1000/10.76 *90 = 1003.72Kg = 1.0 MT
Concrete = .12*1000/10.76 = 11.15 Cum
Is This Answer Correct ? | 19 Yes | 10 No |
Post New Answer View All Answers
How do you change a dimension value in solidsworks?
what is idealized curve for concrere and steel
Where will be the maximum bending moment in a TEE Beam?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
What is rate of concrete surface rendering work per sqm
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
what is the weight of 12mm aggregates?
can i get hindi version of is codes based on civil engineering?
What is demising walls?
Why should you show Client/Engineer activities clearly on the project plan?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
What Are The Different Type Of Slump Test Indications?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
What is absolute pressure? How absolute pressure is calculated?