How much steel and concrit required in 1000 square feet
slab?
Answer Posted / shivaji yadav
Steel = .12*1000/10.76 *90 = 1003.72Kg = 1.0 MT
Concrete = .12*1000/10.76 = 11.15 Cum
| Is This Answer Correct ? | 19 Yes | 10 No |
Post New Answer View All Answers
What are the advantages and disadvantages of using plastic and timber fenders?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
What is the difference between Grade I, II and III of GSB?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
What out turn civil works
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Calculation of Pier Cap with tapper area?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
How much material is required for constructing a 2 Lane 2Km rigid pavement road
what is project?