what is mean by design concrete

Answer Posted / sachin

in design cocrete we follow the code of is 456

Is This Answer Correct ?    1 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?

1493


1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.

2251


How can we demolish concrete beams?

1774


When was the first motorway built in england?

654


Which percentage of carpet area use in plot area of office building.

1395






i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need

2069


Define the various stages of the project planning process in construction.

661


Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.

671


How to arrive dry volume of concrete (1.52 to 1.57) ?

1907


Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

1962


is basic cost of the material includes tax?

1535


all technical question

1687


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

1676


to minimize budget cost of building , what can i do

1668


How are freeway bridges built?

849