why we provide plastic sheet under lean concrete/pcc.?
Answer Posted / neel
to make shuttering water tight. whilw concreeting cement
slurry wastege is more through shuttering to prevent that
polythene sheet is used.
| Is This Answer Correct ? | 4 Yes | 13 No |
Post New Answer View All Answers
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
List out the potential risk factors for workers on the construction site?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
how much used soil in 1 brick of standard size?
Mention different types of roof systems?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
What is gravity flow?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)