why we provide plastic sheet under lean concrete/pcc.?

Answer Posted / neel

to make shuttering water tight. whilw concreeting cement
slurry wastege is more through shuttering to prevent that
polythene sheet is used.

Is This Answer Correct ?    4 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define What is the tallest man made structure in the world?

669


Slump Values for works?

1772


What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers

1860


what is the relation between pitch of steel and depth of slab?

2916


How much cement and water required for cement selery????

1434






how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?

2010


What are the reasons for geotechnical site investigations in uganda?

661


Minimum and maximum size of the building components

1788


How to determine spacing of bars in slabs or beams

1981


what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same

1722


Why should you show Client/Engineer activities clearly on the project plan?

1967


How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight

1451


Explain the difference between shear and tensile strength.

671


Wats the formula of eccentric footing and how was calculated from concrete qty

2580


What are the basic use of runners and standards of pipelines?

693