to make shuttering water tight. whilw concreeting cement
slurry wastege is more through shuttering to prevent that
polythene sheet is used.
Is This Answer Correct ? | 4 Yes | 13 No |
Post New Answer View All Answers
How much quantity of cement,sand,stone used to build 1 cum of cc road??
Which is the direction of negative angle?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Whats the meanig of ,'K' VALUE in the case of soil.....
Civil engineering material testing Standard results
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
What are the applications of cad?
I need model question papers for writing the Dubai municipality exam,for G+1
I what know about life time of frp tank plz explain about it specifications & other details
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
how to prepare site mix design
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700