1.why can't we used sea sand in construction?
2.can we change sea sand into normal sand? if yes how?
Answer Posted / n.kabilan
because sea sand has higher salt content than normal sand
and if ithe sea sand is desalined it may be very costly and
tedious process.
Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
Define What is a kip?
What is the tallest man made structure in the world?
Why we provide hair pin for shed
what are the proper pipes for salt water line
Slab quantity
What ingredients with% found in ppc cement??
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
Technical Question of Civil Engineering
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?