Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What happen if we have run 415 V,50Hz designed motor at on
480V,60HZ

Answer Posted / engr. kashif

Increase in V will cause the insulation of the winding to become weaker with the passage of time and eventually may become short, thus damaging motor and possibly surrounding components.

Increase in frequency causes an increase in motor speed and that may well be harmful as the motor is not designed to run at the new increased speed. This will also cause increase in the motors winding inductance, decrease in the current being drawn, increase in power losses.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain and give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?

1913


We have given to 3phase supply to ups system & how can coming netural

2095


How much kv gas generator is needed to run 2 hp and 1 hp airconditioners, plus a refrigerator and 4 Tvs

5083


What was your role in the silicon evaluation/product ramp? What tools did you use?

1907


why Y CONNECTION IS BETTER INTERMS OF EFFICIENCY AND P.F FOR A LAOD LESS THAN 40% AND WHY AFTER DELTA IS BETTER FOR > 40%

1880


A 3-phase IM is supplied from 50 Hz system. It runs at speed of 1440 rpm and slip equal to 4 %. Calculate number of pole pairs. A 1 B 6 C 2 D 3

1966


We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?

1594


pls,send the previous year written test questions.

1873


What happens if we give the supply to the rotor of induction motor and make its terminal shorted?

3958


what is plunger and what's the use of it in motor alignment?

2583


how much cable size required for 70 kilowatt load.

1620


In a voltage-controlled current source A A current booster is never used B The load is always floated C A stiff current source drives the load D The load current equals Isc

1837


It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.

3804


difference between power surge and switching transient

2023


What is a single phase autotransformer?