A company figured it needed 37.8 sq.feet of carpot for its
reception room. To allow for waste, it decided to order 20%
more material than needed. Fractional parts of sq.feet
cannot be ordered. At Rs.9/- a sq.feet, how much would the
carpet cost?
Answer Posted / yameen yasin
Required Carpot = 37.8 sq feet
20% of 37.8 sq feet = 20% * 37.8 = 7.56 sq feet
Total Order size = 37.8 + 7.56 = 45.36 sq feet
Size orderd = 46 sq feet
Cost of 46 sq feet @Rs9 / sq feet = 46 * 9 = 414 Rs
Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
Work can be done by 8 men and 10 women in 25 days, the same work can be done by 10 children and 5 women . in how many days 2 children and 3 men can do the work?
a train covers the distance D between two cities in hours arriving 2 hours late.what rate would permit to train to arrive on schedule?
A cube 3"* 3"* 3" is painted green it is cut into 1"* 1"* 1" how many cubes were painted on atleast on one side
Find out the Simple Interest paid for a sum of $4000 at the rate of 8% per annum for 3 months.
3x+4y=10, x3 + y3=6, What is the minimum value of 3x+11y=?
the graph was given.the x and y axes were there.the line is intersecting them.the points of intersection were y=3,x=0 and x=-2,y=0.write the equation of line.
If 4 circles of equal radius are drawn with vertices of a square as the center, the side of the square being 7 cm, find the area of the circles outside the square?
a person went to a shop and asked for change for 1.15paise. but he said that he could not only give change for one rupee. but also for 50p,25p,10p and 5p. what were the coins he had
Four Members A, B, C, D are playing a game .A person losing a game should double the amount of others .B, C, D are losing in order after three games .The amount after 3 games are A&B having 40,D is having 16&C 80.What amount did B have?
The time showed by an analog clock at a moment is 11 am then 1234567890 hours later it will show the time as:
A can work three times as B can work. If A takes 60 days less than B to complete the same task, calculate the number of days when both A and B start working together on the same day.
A string of alphanumeric is there. Find a string that starts with b and ends with 3 characters.
aptitude questions
During a given week A programmer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.
A mall installed 36 cctvs at the beginning of the year. In March they installed 9 additional cctvs and then disconnected 18 in August. How many were still installed at the end of the year.