IF
X = Cement ,Fine Aggregate & Coarse Aggregate are in taken in weights for batching.
Y= Cement , Fine Aggregate & Coarse Aggregate are taken in volume for batching.
Then what will be the relation between X and Y?
Answer Posted / maruthu
X = weight = mass
Y = Volume = volume
DENSITY = mass/ volume = x/y
relation between X and Y = DENSITY
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is tension footing?
In Rcc ratio calculation I wanted to know quantity of Steel also.
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
what is the use of beam end forces while using a staad ? wha they are show
how to find hardness of water?why it should be determined?
How do You Maintain a structure after getting cube test of low strength.
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
What is the Roll of Water Bonding under VDF road?
Define What happens to Load at yielding ?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
How to calculate Volume of Wet cement concrete for a specific grade?
what is the types of door's wood?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.