why we provide plastic sheet under lean concrete/pcc.?
Answer Posted / muthukumar
Firstly your question is not specfic any how we have
certain minimum standards to follow as per standard.
1.Usually incase of Concrete screed (Floors) laid above the
plastic sheet beacuse to prevent the concrete in direct
contact with soil which may have some active chemical will
directly react with concrete and alter its property.
2.Specially at foundation where the capillary rise of water
is there plastic sheet or layer sand is used to reduce the
capillary rise of water into the structure
| Is This Answer Correct ? | 35 Yes | 3 No |
Post New Answer View All Answers
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
what is shuttering co efficient?
The portion of a brick cut across the width is called?
how to calculate MR 9(derivation)
how to compute slab reinforcements on step by step procedures??
how much cement sand n bricks required in im3?and how much in plaster?
which type of instrument included in plumbing work?name of instrument?
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
Explain what is Hybrid Foundation?