Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / abid
h/6(a1+a2+4a m),
a1= area of top
a2= area of bottam
am=average of both area
h= height at mid (like:-D)
| Is This Answer Correct ? | 53 Yes | 22 No |
Post New Answer View All Answers
Why we provide hair pin for shed
what is mean by reestimation?
Sir how to find cutting length for footing steel bars in the shape of "u"
What is rolling stock
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
what is the relation between pitch of steel and depth of slab?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
Which are the top apps for you civil engineer?
Explain what are the skills required to become an architect?
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
What is an object snap mode?
how i can tak Quantity of mortar in block work
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.