Answer Posted / satyam shantanu
a temporary structure for holding workers and material
during erection,repair or decorating of a building.
Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
What are the different methods for drawing an arc?
what are RIB slabs explain about it
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
what is your role of in previous company as a construction manager
List out the types of roofs?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
How to plan a project
What Are The Different Type Of Slump Test Indications?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
what is right & short method of measurement of slab&beam
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
what is Short bored pile foundation.
Water filter calculation formula
what is the function of GSB all class ?
What type of tensile strength is handling by crank in beam? Thanks.