Answer Posted / prince
why no hv mentioned abt the Test Plan -Exit Criteria.
while Test Plan is done we use to mention the Exit Criteria
Right,we shd Indentify that Exit Criteria also to Stop
Testing know?
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
Hi I m working as a sqa engineer and after 1 yr i want to switch to system analyst side kindly tell me how both fields relate each other and is this easy to switch job from qa to system analyst and what's the difference b/w both fields.
What is bug leakage and bug release?
What should QA require of Development?
How do you decide you have tested enough?
create a daily status report or list the items you will cover in a status report
Give me an example of the best and worst experiences you've had with QA.
What are verification and validation and difference between these two?
Why do you want to work for us?
What is software process?
kindly guide me about inspection process with the requried roles in detail?
What is verification?
Explain what is the difference between regression testing and retesting?
How do you deal with environments that are hostile to quality change efforts?
Questions for role of a QC engineer at NDS,Bangalore 1st round is written 20 questions on aptitude and 10 question on testing Aptitude--problems on time and distance,tap problem,ages,time and work,probability, Testing 1.Difference Between QA & QC 2.Any 4 types of SDLC models with diagram. Also Pros and cons of each model 3.What is application Testing And embedded testing 4.Qualities of a good tester 5.Test cases for registering user. One field for user name,2 fields for password,"ok" and "cancel" button 6.What is a bug,explain Bug life cycle 7.Difference between priority and severity? 8.Some question on software design
-What do you think about unit testing? -How do you assure quality of the code you release? -How do you release software?