Answer Posted / yazir hasainar
it is 7000/cu.m
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
as per is code, what is the minimum content of opc and ppc cement for rcc structure
cause of cylinder test failure
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
Explain soil analysis?
How long does it take concrete to harden?
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
Gidc technical que paper
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
Dear Sir What is the Contraction joint for base Slab
construction workers how much time take one work or qty
Define current ucs?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
it is a corrected question." make a list of engineering property(properties) of soil.
Test procedure of fly ash bricks as per code ?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.