how much current will be drawn by 3 phase, 415v, 50 hz, 20
ton central ac
Answer Posted / rajatsahu
1 ton=3516 watt
20 ton=3516*20=70320watt
p=1.732*415*i*0.8
70320=575.02*i
i=
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF Govt Polytechnic in deee 2nd year papers
from where the self excitrd induction generator get the power?why is the voltage regulation is poor of seig?
Dear Brother can u tell the proper size selection of cable & the fault level calculation of braker, busbar etc. pls mail me at azeemk30@gmail.com
What current flows in the transformer primary when its secondary is open?
how to ctrl motor by use of ac or dc drive.plz explain evdintly
Draw the vector diagram and condition for the following: 1) Dyn1 2) Ynd0 3) YnYn0
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
WHAT IS THE WORKING PRINCIPLE OF A GENERATER.how is a GTG (Gas TURBANE Generater) working.plz explane
fuel-air ratio in a petrol engine fitted with suction carburettor,operating with dirty air filter as compared to clean filter will be
As an electrical engineer what are the responsibilities which i can hold in TCS?
If one lamp connects between two phases it will glow or not?
Hi.. I am a BE GRaduate in E&E. I have 8.5 Experience in Tendering & Estimation field. I have done SAP SD course few years back. But due to some reason i failed to get job in that field and continued my own field. Now I am thinking of changing into SAP seriously. How should i go ahead???
what is difference between earthingpits,earthing grid & earthing mess?
we have 2.2kw,Y,3000rpm motor but 6leads found in TB what happen if we connect in delta?
How to findout raw or ups power? its not indicated in socket,