Answer Posted / gaurav kdk
1 Tow point method.
2 Three point method.
3 By megger.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
what is the total power generation in india?
i have interview in Pepsi company what type of question will ask please send the question and answeer
How to check the cable fault / hv test of transformer cable.
Calculate torque developed by the 3-phase, 5 H.P., 4 pole induction motor runs at 1500 rpm A 23 N-m B 21 N-m C 10 N-m D 0 N-m
What happens if the series current double?
What are the main faults of DC generators?
what is the transiant condition in alternator? and how it can be prevanted?
how much cable size required for 70 kilowatt load.
what is the calculation involved to design the heater to heat 10KL of water in temperature control unit?
what curve and rateing would you use for a three phase 0.75kw motor?
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
what are the Alarm, Trip & Safety equipment (Issues) present in Power Transformers pls Mail it to ashokbabunhce@gmail.com
why the NGR (neutral grounding resistor) always OFF during DG off?
Define closed loop control system.