1.what are all the types in backflashing? and T-cde for it
2.what are the different places we can give back flush
indicator?
3.what is product cost collector & its t-code?
4.what are all the costs involved in product cost collector
5.how many types of SOP?what is t-code for SOP
6.scheduling parameters for a production orders
7.how do you carry out capacity leveling
8.can you dispatch capacity for a single work center
Answer Posted / guest
1. Assembly backflush , component backflush & activity back
flush.
2. in Material master ( MRP 4 ) & production version.(MRP4)
REM profile,
3.calculating the preliminary cost of the backflush material
is known as Product cost collector (Tcode : KKF6N).
4.Material cost, Material overhead , sub-contracting
charges, conversion cost & total cost.
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
What is the difference between the fixing type 1, 2, 3, 4?
Mention what is the difference between stock transport order and stock transfer order?
Explain PI sheet.
Difference between standard cost and variable cost.
How you get the ticket?
How do you do capacity planning ?
What do we do in the realization phase?
How do you restrict the data to be entered in the payroll area?
Explain Planning file entry.
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
What is detail scheduling
How is the processing time calculated in a wc when both labor, machine categories exist?
What is 'mps' (master production scheduling)?
Explain what is the need of mrp list if the stock requirement list is already given?
what are Standard keys