Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is difference between bending and twisting

Answer Posted / kumar

bending means changes of bar/boby in axis from x to y or z ,
But twisting means changes of bar/body in same axis.

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is tension footing?

1966


How can you produce desired alloys and discuss their applications in daily life.

1211


in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing

3866


What is the cost difference between site mix and ready mix concrete per cubic meter

1876


How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?

2080


Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....

2402


For a washout valve why are two gate valves required in normal practice?

1140


do we decide reinforcement steel , based on bending moment ? give example with continous slab?

2368


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2150


What is bylayer?

1148


Explain what is the release of lien?

1224


Why is concrete cube test carried out?

1242


What is the quantity of cement in mix m20 concrete?

1152


How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

4994


what is the difference between replacement of cement by groundnut shell ash

3196