Answer Posted / ujjawal u daharwal
as per Indian standard 1440 kg/cu.mtr. (Conforming to IS 269)
and as per British Standard 1442 kg/cu.mtr
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
how to caluclate sienerge qty in construction in ap
How many square meter can mason layout chb per hour
Which Types Of Bricks ?
silt%= silt volume/ silt+sand volume is this right?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
What year was the keystone power plant in Indiana County constructed?
What are the advantages and disadvantages of using plastic and timber fenders?
What is the release of lien?
density of crush sand & crush stone or grit powder
What is horizon or horizontal mining?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what are the proper pipes for salt water line
What are the responsibilities of a site manager?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?