Answer Posted / neeraj
Associate Cement Company
| Is This Answer Correct ? | 28 Yes | 3 No |
Post New Answer View All Answers
what does the track parameter mean in staad.pro?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
How and where are aqueducts built?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
How do you compute the volume of airflow?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
why top layer of block work shoud be full size if any cut block adjustable than another layer?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
For Wet Mix Mecadam design what is Optimum moisture content
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
How do you compute volume of airflow?
What is meant by solid geometry?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation