Answer Posted / lingaiah
COIS is a Display View "Order Information system: Overall
Profiles".
COOIS: Production order information system
We can see the overall production order under the specific
field values.
COIS is Profile of production order information system
For example Standard Profile "00000000001"
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is Auto GR?
Define standard cost
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
List out the basic procedure for dispatching operations in capacity leveling?
What is the use of mrp pp evaluations?
Which MRP types you have used?
Explain DMR.
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
What is mrp group and what is the use of it?
what do you mean by opening periods
What do we do in the realization phase?
What do you do to run MRP for just one MRP Controller?
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
Can’t one material be assigned to more than one operation in a routine?