How to transfer the objects? Have you transferred any objects?

Answer Posted / subeesh kannottil

In a three system landscape the object has to transferred
from development to quality and then quality to production.
and in a two system landscape the object is transferred from
development to production.

When saving each objects instead of saving in local object
save in a package under a transport request .

After all development and testing the transport request is
released .

Usually the releasing is done by the BASIS team.
tcode used is se09.

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is alv programming in abap? When is this grid used in abap? : abap hr

683


What are function modules?

582


What is the difference between a dialog program and a report?

561


What will be your approach towards optimizing legacy code? Will you suggest change in technology? Does OO ABAP bring any performance benefits? How will you deal with queries in a loop? How will you optimize nested loops?

908


What is sequence number

1752






If I have put commit in badi implementation class after update, is it allowed? Also if some standard functionality already implemented an update and now i m doing update and if it fails, what will be the impact of commit?

1250


What is payroll driver

1652


What are the mandatory fields to be filled for BAPI_CUSTOMER_CREATEFROMDATA1

2901


What are the differences between sap memory and abap memory?

581


What is meant by slab? How is indian slab and us slab? : sap abap hr

560


what is leave to TRANSACTION?

1004


What are the contents in technical specifications?

606


How can we achieve MVC ?

908


When you prefer lsmw?

594


What is macro? : abap hr

642